Dismantling and installation of SGT Ruston, ABB, Alba Power, Alstom
Dismantling and installation of SGT Ruston, ABB, Alba Power, Alstom - фото 1
Обновлено: 22 ноября 2020, 22:11

Dismantling and installation of SGT Ruston, ABB, Alba Power, Alstom

256 000 $/штука
Условия поставки: EXW Белгород
Фиатов Геннадий
инженер консультант
,  Белгород, RU
на Флагма с 18 апреля 2015

Описание

Installation and start-up of power plants with gas turbine engines type SGT from such manufacturers as Ruston, ABB, Alba Power, Alstom, Siemens with a capacity from 2 MW to 75 MW ..
Dismantling of power plants.
Each SGT type gas turbine engine has different variants, each SGT engine has been owned by a different company over the years.
Such as Ruston, ABB, Alba Power, Alstom, and now Siemens.
For this reason, I ask you to indicate the exact name of your gas turbine engine and provide documents for the package and engine passport when contacting our specialists.
Works include the following activities:
- testing the engine at full power before dismantling;
- preparation of a sales contract; -
assessment of the risks required for the safe decommissioning of gas turbine equipment and power equipment;
- preparation of manuals and step-by-step instructions;
- physical dismantling and removal of all related equipment;
- Moving through the territory of the customer country and loading at the port, with subsequent export;
- Delivery to the place of demand;
- Unloading the power plant at the place of regular use and the end user;
- Installation;
- Configuring all systems and starting.
Gas turbine engine service company Ruston, ABB, Alba Power, Alstom, Siemens provides services all over the world.
Development of technical specifications
(Technical inquiry) based on repair documentation.
We provide services for troubleshooting gas turbines, conducting Inspections, overhaul, refurbishment.
Please contact our duty engineers and consultants for more detailed information.
Please contact by WhatsApp

Номер объявления: 1674731   |  просмотров: 2  
,  Белгород, RU
на Флагма с 18 апреля 2015

Похожие объявления

Installation, configuration and start-up power plants Ruston SGT-200
650 000 $/услуга EXW
Stanok expert, ООО, RU, 180 км +37 объявлений
Installation, configuration and commissioning of gas turbine power plants Siemens (Ruston) SGT-200 with a capacity of 6.5 MW. The gas turbine...
Ruston SGT200 Alstom gearbox and starter drive
61 000 €/шт EXW
Stanok expert, ООО, RU, 180 км +37 объявлений
Selling a reducer and starting drive of a gas turbine engine Ruston SGT200 Alstom Tornado. Gearbox and starter drive - manufactured by Allen...
Selling gas turbine engine SGT400 Siemens
7 400 000 $/компл EXW
Stanok expert, ООО, RU, 180 км +37 объявлений
Selling SGT400 Siemens gas turbine engine. The SGT-400 offer includes a complete set (power turbine + transition channel + gas...
Показать еще
Свяжитесь с компанией
Фиатов Геннадий
инженер консультант
По телефонам
В мессенджерах
Скажите, что нашли объявление на Флагма
Правила безопасности: Не соглашайтесь на предоплату, если не уверены в надежности компании.
Написать сообщение
Выбрать раздел
×
Вход в личный кабинет